Featured projects

Facade sealant, waterproofing, and high access works across Metro Manila.

42 completed properties and 2 ongoing towers in Makati, Taguig, Pasay, Quezon City, Pasig, Muntinlupa, Parañaque, Manila, Cavite, Pampanga, and Negros Occidental. Each entry carries a short project review describing what was actually done on the building.

Quantities, products, and exact work areas are confirmed against project records before they appear in a proposal. Site photography is shared privately, subject to client permission.

Mpire Center in Quezon City, Exterior precast to precast sealant application by Balda & Calalang Co.
Mpire Center, Quezon City
The Upper Class in Quezon City, Exterior precast to precast sealant application by Balda & Calalang Co.
The Upper Class, Quezon City
CTP Asean Tower in Muntinlupa City, Exterior precast to precast sealant application by Balda & Calalang Co.
CTP Asean Tower, Muntinlupa City

Makati City

7 properties

Air Residences in Makati City, facade maintenance project by Balda & Calalang Co.
CompletedInterior sealant works

Air Residences

Makati City

Air Residences in Makati City called for interior sealant works in units and common wet areas where movement joints had opened. The crew cut out tired material, cleaned back to sound substrate, and applied a sanitary grade, mould resistant sealant with a clean tooled line at every tile and fixture interface. Floor protection and daily housekeeping kept occupied corridors presentable.

MJ Corporate Plaza in Makati City, facade maintenance project by Balda & Calalang Co.
CompletedExterior sealant application

MJ Corporate Plaza

Pasong Tamo Extension, Makati City

MJ Corporate Plaza along Pasong Tamo Extension had exterior joints hardened by years of sun and vehicle exhaust. The crew removed the old bead, primed the joint faces, and installed a UV stable weatherproof sealant with even tooling across the full elevation grid. Sections were released back to the building only after visual and adhesion checks.

V Corporate Centre in Makati City, facade maintenance project by Balda & Calalang Co.
CompletedScope pending project record confirmation

V Corporate Centre

125 L. P. Leviste Street, Salcedo Village, Makati City

V Corporate Centre on L. P. Leviste Street in Salcedo Village was serviced with certified rope access on a tight, fully built up city block. Building protection works were executed with materials matched to the existing facade system and recorded photographically for the property manager's file. The detailed trade breakdown is confirmed against project records before publication.

Bank of Makati Building in Makati City, facade maintenance project by Balda & Calalang Co.
CompletedExterior sealant application

Bank of Makati Building

Ayala Avenue Extension, Makati City

On Ayala Avenue Extension, the Bank of Makati Building needed exterior joints reworked without disturbing banking hours. Rope crews started before the branch opened, cut out failed sealant, primed, and reinstated the bead with tight tooling and clean masking so no smearing reached the cladding. Completed elevations were water tested and photographed for the turnover pack.

Techzone in Makati City, facade maintenance project by Balda & Calalang Co.
CompletedExterior sealant application

Techzone

Gil J. Puyat Avenue, Makati City

Techzone on Gil J. Puyat Avenue faces one of Makati's heaviest traffic corridors, and its joints carried a decade of soiling. Preparation was the bulk of the job: full removal, mechanical cleaning, and priming before any new sealant was gunned in and tooled. The result is a uniform, resealed envelope that will not need chasing after the next storm.

Alphaland Makati Place in Makati City, facade maintenance project by Balda & Calalang Co.
CompletedExterior sealant application

Alphaland Makati Place

Ayala Avenue corner Malugay Street, Makati City

Alphaland Makati Place on Ayala Avenue combines residential, retail, and club floors, so exterior sealant works were staged by use. Joints were cut out, primed, rod backed, and resealed with a weatherproof, high movement product, with drops planned to keep away from terraces and amenity decks in use. Each completed elevation was inspected and photographed before sign off.

Solstice at Circuit Makati in Makati City, facade maintenance project by Balda & Calalang Co.
CompletedInterior waterproofing and interior and exterior sealant

Solstice at Circuit Makati

Circuit Makati, Makati City

At Solstice at Circuit Makati, unit wet areas and the building's joint lines were addressed in one coordinated package. Bathroom and balcony substrates received a liquid applied membrane with detailing at drains and upstands, then interior and exterior joints were resealed with compatible weatherproof products. Each unit was flood tested and photographed before turnover to the developer.

Taguig City

6 properties

The Big Apple in Taguig City, facade maintenance project by Balda & Calalang Co.
CompletedExterior sealant application

The Big Apple

7th Avenue North, Bonifacio Global City, Taguig City

The Big Apple on 7th Avenue North in Bonifacio Global City is a compact tower with dense joint runs around its openings. Every perimeter and movement joint in scope was cut out, primed, rod backed, and resealed with a weatherproof product rated for the exposure, with special attention where dissimilar materials meet. Finished work was checked for continuity rather than just appearance.

Viceroy Executive Residences Towers 1 to 4 in Taguig City, facade maintenance project by Balda & Calalang Co.
CompletedExterior sealant application

Viceroy Executive Residences Towers 1 to 4

McKinley Hill, Taguig City

Four towers at Viceroy Executive Residences in McKinley Hill were recaulked to a single repeatable method statement. Each tower's joint grid was mapped, stripped, primed, rod backed, and resealed, with crews rotating between towers so occupied floors were disturbed once. Consistency across all four elevations was the deliverable, not just watertightness on one.

One Maridien in Taguig City, facade maintenance project by Balda & Calalang Co.
CompletedInterior waterproofing and interior and exterior sealant

One Maridien

High Street South, Bonifacio Global City, Taguig City

One Maridien in Bonifacio Global City called for interior waterproofing alongside interior and exterior sealant works. Wet areas were prepared, primed, and membrane treated with reinforcement at corners and penetrations, then flood tested before finishes returned. Only after that were the interior and exterior joints resealed, so the two systems worked together rather than hiding each other's defects.

Two Maridien in Taguig City, facade maintenance project by Balda & Calalang Co.
CompletedInterior waterproofing and interior and exterior sealant

Two Maridien

High Street South, Bonifacio Global City, Taguig City

Two Maridien was delivered as the second phase of the Maridien programme, using the lessons from its sister tower. Interior wet areas were waterproofed with a membrane and detailed at all penetrations, then interior and exterior joints were resealed with compatible products. Testing per area preceded any finishing so nothing was closed up over a defect.

Verve Residences Tower 1 in Taguig City, facade maintenance project by Balda & Calalang Co.
OngoingRemoval of existing sealant; reapplication of new weatherproof sealant; mesh application; leak testing

Verve Residences Tower 1

High Street South, Bonifacio Global City, Taguig City

Verve Residences Tower 1 in Bonifacio Global City is in progress. The crew is removing existing sealant across the facade, applying reinforcing mesh where the specification calls for it, reinstating new weatherproof sealant, and leak testing each completed section before moving down. Progress is reported elevation by elevation with photographs and test results.

Verve Residences Tower 2 in Taguig City, facade maintenance project by Balda & Calalang Co.
OngoingRemoval of existing sealant; reapplication of new weatherproof sealant; leak testing

Verve Residences Tower 2

High Street South, Bonifacio Global City, Taguig City

Verve Residences Tower 2 runs in parallel with its twin under the same method statement. Existing sealant is being removed, new weatherproof sealant reinstated at controlled depth, and completed sections leak tested before the crew descends further. Sharing crews and access rigging between the two towers keeps the residential programme short.

Pasay City

4 properties

Avida Towers Prime Taft in Pasay City, facade maintenance project by Balda & Calalang Co.
CompletedRepair of sealant and partial roof deck waterproofing

Avida Towers Prime Taft

Taft Avenue, Pasay City

Avida Towers Prime Taft on Taft Avenue combined two problems: sealant failure and localised roof deck ingress. Wet area substrates were ground back, primed, and membrane treated with reinforcement at upstands and drain collars, while interior and exterior joints were resealed with compatible products. The two trades were sequenced so the waterproofing cured before the joint work closed the envelope.

Shore Residences Towers 1, 2 and 3 in Pasay City, facade maintenance project by Balda & Calalang Co.
CompletedInterior sealant works

Shore Residences Towers 1, 2 and 3

Mall of Asia Complex, Pasay City

Three towers at Shore Residences in the Mall of Asia Complex were handled as one programme with a repeating unit by unit checklist. Interior joints at wet walls, counters, and fixture perimeters were stripped, cleaned, and resealed with compatible sanitary sealant, then signed off per unit. Working to a fixed daily unit count let the property team schedule resident notices in advance.

UL

Pasay City

Firewall waterproofing and painting works

Site photo available on request

CompletedFirewall waterproofing and painting works

UNI-LAMPS & Builders Company

Pasay City

At UNI-LAMPS & Builders Company in Pasay City the firewall was exposed, unpainted, and shedding water into the wall cavity. Surface preparation removed loose render and biological growth, cracks were treated, and a waterproofing plus finish paint build up was applied to give both a barrier and a tidy elevation. Works were completed without touching the adjoining property.

NexGen Tower in Pasay City, facade maintenance project by Balda & Calalang Co.
CompletedExterior and interior sealant application

NexGen Tower

EDSA Extension, Pasay City

NexGen Tower along EDSA Extension required interior and exterior joint works on a building already occupied. Inside, wet area and fixture joints were stripped and resealed with sanitary sealant; outside, the exposed joints were primed, rod backed, and finished with a weatherproof bead. Sequencing kept the interior works ahead of the facade drops to avoid double handling.

Quezon City

8 properties

Mpire Center in Quezon City, facade maintenance project by Balda & Calalang Co.
CompletedExterior precast to precast sealant application

Mpire Center

93 West Avenue, Quezon City

Mpire Center sits on West Avenue where traffic grime and monsoon rain hit the same elevations year after year. Crews worked the precast joint grid from top to bottom, cutting out hardened sealant, wire brushing the panel arrises, priming, then bedding new backer rod at a consistent depth before gunning and tooling the weatherproof sealant. Completed bays were hose tested the same week so the Quezon City property team could sign off elevation by elevation.

The Upper Class in Quezon City, facade maintenance project by Balda & Calalang Co.
CompletedExterior precast to precast sealant application

The Upper Class

Quezon Avenue corner Scout Reyes Street, Quezon City

The Upper Class faces two busy Quezon City corridors, so joint failure showed up first as staining on the inner face of the precast. The remedy was targeted: map the failing runs, remove the old material without spalling the panel edge, then reinstate a primed, rod backed, correctly profiled sealant line. Access was by rope so residents kept their views and no scaffold footprint touched the sidewalk.

GB

Quezon City

Scope pending project record confirmation

Site photo available on request

CompletedScope pending project record confirmation

Geremy Building

766 Tandang Sora Avenue, Banlat, Quezon City

Geremy Building on Tandang Sora is a mid rise commercial property with recurring damp complaints on upper floors. B&C carried out building protection works with certified access personnel, correct material selection for the existing substrates, and photo documentation of each treated area. The trade by trade quantities are released from project records at proposal stage rather than published here.

Eastwood Parkview 2 in Quezon City, facade maintenance project by Balda & Calalang Co.
CompletedScope pending project record confirmation

Eastwood Parkview 2

Eastwood City, Quezon City

Eastwood Parkview 2 is a dense residential cluster where any work at height has to stay clear of balconies and occupied units. The team used rope access with full drop zone control, treated the affected building fabric, and turned over the works with before and after photography per drop line. Detailed scope quantities are confirmed against project records before they enter a proposal.

MH

Quezon City

Firewall waterproofing and painting works

Site photo available on request

CompletedFirewall waterproofing and painting works

Mac Huat Construction Supply Inc.

Regalado Highway, Quezon City

The party firewall at Mac Huat Construction Supply Inc. on Regalado Highway was wicking water into the interior. Crews washed down the wall, opened and filled cracks and honeycombing, then applied a waterproof coating followed by a protective topcoat colour matched to the building. Rope access avoided any encroachment onto the neighbouring lot.

MH

Quezon City

Firewall waterproofing and painting works

Site photo available on request

CompletedFirewall waterproofing and painting works

Metro Husky Corporation

Quezon City

The Quezon City firewall at Metro Husky Corporation was treated as the drainage plane it actually is. After cleaning and crack repair, the surface was primed and coated with a flexible waterproofing layer able to accommodate hairline movement, then finished in a protective paint. Terminations at the parapet and the wall to roof junction received the most attention, since that is where the failures started.

Sentinel Residences in Quezon City, facade maintenance project by Balda & Calalang Co.
CompletedExterior sealant application

Sentinel Residences

Quezon City

Sentinel Residences in Quezon City was resealed elevation by elevation so residents were only affected for a day at a time. Old joint material was removed, panel edges cleaned and primed, and new weatherproof sealant applied at the correct width to depth ratio so the bead can move without splitting. Notices, drop schedules, and photos were issued to the admin office throughout.

The Magnolia Residences Tower C in Quezon City, facade maintenance project by Balda & Calalang Co.
CompletedInterior and exterior sealant application

The Magnolia Residences Tower C

New Manila, Quezon City

Tower C at The Magnolia Residences in New Manila needed both interior and exterior sealant attention on an occupied residential tower. Outside, the joint grid was stripped, primed, and resealed with a weatherproof bead; inside, wet area and fixture joints were renewed with sanitary sealant unit by unit. Resident scheduling and clean daily close out were as much a part of the scope as the sealant.

Pasig City

5 properties

Jollibee Tower in Pasig City, facade maintenance project by Balda & Calalang Co.
CompletedWindow glass cleaning

Jollibee Tower

F. Ortigas Jr. Road corner Garnet Road, Ortigas Center, Pasig City

Jollibee Tower in Ortigas Center required high access glass cleaning across a full curtain wall with pedestrian traffic below. Rope teams worked pre agreed drops with exclusion zones at street level, using purified water and squeegee technique to leave no streaking or residue on frames and gaskets. The clean also gave the property team an incidental visual survey of gasket and seal condition.

The Pearl Place Tower A in Pasig City, facade maintenance project by Balda & Calalang Co.
CompletedExterior sealant application

The Pearl Place Tower A

Pearl Drive, Ortigas Center, Pasig City

The Pearl Place Tower A on Pearl Drive had exterior joints breaking down on its weather facing elevations first. The crew prioritised those faces, removing defective material, priming, and installing new weatherproof sealant at controlled depth with consistent tooling, then worked around to the sheltered sides. Progress was reported to the Ortigas property team per completed drop.

The Pearl Place Tower B in Pasig City, facade maintenance project by Balda & Calalang Co.
CompletedScope pending project record confirmation

The Pearl Place Tower B

Pearl Drive, Ortigas Center, Pasig City

Tower B at The Pearl Place was serviced alongside its twin, using the same access setup and crew to keep the programme short. Building protection works were carried out with certified rope access, materials matched to Tower A for a uniform appearance, and photo documentation per elevation. The itemised trade breakdown is confirmed against project records before publication.

Ortigas Technopoint in Pasig City, facade maintenance project by Balda & Calalang Co.
CompletedExterior sealant application

Ortigas Technopoint

J. Vargas Avenue, Ortigas Center, Pasig City

Ortigas Technopoint on J. Vargas Avenue is a working commercial and industrial address where downtime is expensive. Exterior joints were reworked in short, contained drops: remove, clean, prime, rod, gun, tool, with the area returned to normal use each evening. Finished elevations were water tested to confirm the envelope before the crew relocated.

The Sandstone at Portico in Pasig City, facade maintenance project by Balda & Calalang Co.
CompletedInterior waterproofing and interior and exterior sealant

The Sandstone at Portico

Capt. Henry P. Javier Street, Oranbo, Pasig City

The Sandstone at Portico in Oranbo needed waterproofing and sealant works on a residential handover schedule. Wet areas were prepared and membrane treated with upstand and drain detailing, then joints inside and out were resealed with compatible weatherproof products. Units were released in batches with test records and photographs attached to each batch.

Muntinlupa City

4 properties

CTP Asean Tower in Muntinlupa City, facade maintenance project by Balda & Calalang Co.
CompletedExterior precast to precast sealant application

CTP Asean Tower

Asean Drive, Filinvest City, Alabang, Muntinlupa City

At CTP Asean Tower in Filinvest City, the brief was a full recaulk of the precast panel network on an occupied office tower. Work ran outside peak hours, one elevation at a time, with old sealant stripped, substrates solvent wiped, and the new weatherproof bead tooled to a shallow concave that sheds water instead of holding it. Joint depth and adhesion were spot checked with pull tests as the crew descended.

1210 Acacia in Muntinlupa City, facade maintenance project by Balda & Calalang Co.
CompletedExterior precast to precast sealant application

1210 Acacia

Madrigal Business Park, Alabang, Muntinlupa City

1210 Acacia in Madrigal Business Park needed its precast joints reset before the wet season. Crews sequenced the tower by elevation so the leeward faces were finished first, removing brittle sealant, priming the panel edges, and reinstating a rod backed bead at controlled depth. Random joints were opened for inspection after cure to confirm adhesion on both faces.

One Trium Tower in Muntinlupa City, facade maintenance project by Balda & Calalang Co.
CompletedExterior precast to precast sealant application

One Trium Tower

Filinvest Avenue, Alabang, Muntinlupa City

One Trium Tower on Filinvest Avenue was recaulked across its precast panel joints while the office floors stayed in use. The crew removed degraded sealant, addressed minor edge chipping on the panels, then installed primer, backer rod, and new weatherproof sealant with uniform tooling. Water testing on completed elevations closed out each section of the Muntinlupa tower.

Landmark Alabang in Muntinlupa City, facade maintenance project by Balda & Calalang Co.
CompletedInterior and exterior sealant application

Landmark Alabang

Festival Mall, Filinvest City, Muntinlupa City

At Landmark Alabang inside Festival Mall, sealant works covered both the exposed exterior joints and interior joints in retail and service areas. Exterior runs were reworked for weather performance; interior runs used low odour, quick setting products so retail spaces reopened on schedule. All noisy preparation was pushed to mall closed hours.

Parañaque City

3 properties

Sinocan Corporate Center in Parañaque City, facade maintenance project by Balda & Calalang Co.
CompletedExterior precast to precast sealant application

Sinocan Corporate Center

Aseana Business Park, Parañaque City

Sinocan Corporate Center in Aseana sits close to the bay, so salt laden wind accelerates joint fatigue. The precast to precast lines were reworked with marine tolerant weatherproof sealant: strip out, clean, prime, rod, gun, tool. Reclad free repair kept the building operating normally while the envelope was brought back to a watertight condition.

Aseana II in Parañaque City, facade maintenance project by Balda & Calalang Co.
CompletedScope pending project record confirmation

Aseana II

Bradco Avenue, Aseana Business Park, Parañaque City

Aseana II on Bradco Avenue is a reclaimed area development where coastal exposure drives the maintenance cycle. B&C delivered building protection works using certified access, materials selected for the marine environment, and a photo documented turnover per drop. The itemised scope is released from project records at proposal stage.

Solaire Resort & Casino in Parañaque City, facade maintenance project by Balda & Calalang Co.
CompletedInterior and exterior sealant application

Solaire Resort & Casino

Entertainment City, Parañaque City

At Solaire Resort & Casino in Entertainment City, sealant works ran on both interior and exterior faces inside a twenty four hour operation. Exterior joints were reworked with a weatherproof, high movement product, while interior joints in back of house and wet areas were resealed with low odour, sanitary materials. Every shift was coordinated with hotel operations so guest areas stayed unaffected.

Manila

2 properties

168 Residences in Manila, facade maintenance project by Balda & Calalang Co.
CompletedScope pending project record confirmation

168 Residences

Binondo, Manila

168 Residences in Binondo is a busy, tightly packed Manila block with almost no ground level working room. B&C used rope access to deliver the building protection works entirely from above, protecting the street and shopfronts below, and documented each treated area photographically. Detailed quantities remain subject to as built verification.

UST Quadricentennial Pavilion (Sports Complex) in Manila, facade maintenance project by Balda & Calalang Co.
CompletedFit out works

UST Quadricentennial Pavilion (Sports Complex)

University of Santo Tomas, Manila

Fit out works at the UST Quadricentennial Pavilion had to fit around an active university and event calendar. Works were sequenced in phases with hoarding, dust control, and protection of the playing surfaces and seating, then handed over clean between bookings. Coordination with the campus facilities team drove the programme more than the trade itself.

Cavite

1 property

MDC 101 Phase 1 in Cavite, facade maintenance project by Balda & Calalang Co.
CompletedExterior sealant application

MDC 101 Phase 1

Molino Road, Bacoor, Cavite

MDC 101 Phase 1 on Molino Road in Bacoor takes wind driven rain from the open west, so joint discipline mattered more than speed. Defective joint material was removed, substrates were cleaned and primed, and new weatherproof sealant was installed at controlled depth with consistent tooling. Each finished elevation was reviewed with the site engineer before the crew moved on.

Pampanga

1 property

MI

Pampanga

Roof deck slab waterproofing

Site photo available on request

CompletedRoof deck slab waterproofing

Mang Inasal Mabalacat Branch

Mabalacat, Pampanga

The roof deck slab at the Mang Inasal Mabalacat branch was leaking into a live dining and kitchen area. Works ran overnight: deck cleaned and dried, cracks routed and filled, drains and upstands reinforced, and a waterproofing system applied in measured coats. The slab was tested and returned to service before the branch opened the next morning.

Negros Occidental

1 property

Bacolod Philippines Temple & Ancillary Building in Negros Occidental, facade maintenance project by Balda & Calalang Co.
CompletedFacade and roofing cleaning

Bacolod Philippines Temple & Ancillary Building

Bacolod City, Negros Occidental

The Bacolod Philippines Temple and its ancillary building carry sensitive stone and roofing finishes, so cleaning method mattered more than pressure. Test patches established the right technique per material, then facade and roof surfaces were cleaned to remove biological growth and staining without etching stone, opening laps, or stripping coatings. Access and containment were planned around the site's use.

Other locations in the Philippines

2 properties

RD

the Philippines

Leak repair and interior painting

Site photo available on request

CompletedLeak repair and interior painting

RGO Diagnostic Center

Philippines

A diagnostic centre cannot run repeat repairs around imaging equipment, so the leak at RGO Diagnostic Center was traced to its source before any finish was touched. Once the ingress path was repaired and confirmed dry, the affected interior was reskimmed and repainted so the space reopened looking specified rather than patched. Works were staged around clinic hours.

RG

the Philippines

Roof slab waterproofing

Site photo available on request

CompletedRoof slab waterproofing

RG Garcia Commercial Building

Philippines

The roof slab at RG Garcia Commercial Building was the single source of the interior damp below. The deck was cleaned and dried, cracks were routed and filled, and drains and upstands were detailed with reinforcement before the waterproofing system was applied in coats to a measured thickness. A flood test held overnight confirmed the slab before ballast and access routes were reinstated.